• Welcome to GoMeanGreen.com!

    Thank you for visiting us!  Registering is easy and free, and provides you with the ability to participate in the discussions along with many cool features and content.

Recommended Posts

Really appreciate the update.  Looks like steel columns are being delivered.  Which leads me to believe the footings/perimeter foundation is in place.

Edited by DeepGreen

Share this post


Link to post
Share on other sites
48 minutes ago, DeepGreen said:

Really appreciate the update.  Looks like steel columns are being delivered.  Which leads me to believe the footings/perimeter foundation is in place.

Great eye! You are right. They are about 3 weeks behind because of rain! GMG 

Share this post


Link to post
Share on other sites

It took what seemed like forever to finish my son’s high school IPF(75yd x 65yd playing surface and 52ft high) because the manufacturer wasn’t  able to keep up with demand, and kept delivering it in separate pieces.  It’s damn nice though and was worth the wait.

15822CF1-13B5-4425-9BA1-BF67E783C22C.png.3d01a913eff2088cecda23b5ac7b60b1.png

Has four Big Ass Fans.

8F755917-91C4-42E0-829F-28091F42CC19.png.8fc2f5d33edbb23d5be48a00e299439c.png

Has four 75 foot long batting cages suspended from the ceiling.

46ED445F-B4AC-47CD-8D4D-ABC4BD8A4891.png.5f1587cfb76a0afec835480bf20fe5ab.png

396BFEFA-AE0C-436D-B389-9F68CBBEB1D1.png.977b61e20ba5053decdeda5419771540.png

So as nice and as large as the Mean Green IPF is going to be I’ll be surprised if it’s completed by the end of August.

 

Rick

Share this post


Link to post
Share on other sites

No offense Rick, but it's hard for me to imagine a high school having those types of facilities.  Very nice.

Taxpayer funded.

  • Upvote 1

Share this post


Link to post
Share on other sites
2 hours ago, trud1966 said:

well, that hardly looks indoors to me...I blame RV!

 

 

2 hours ago, trud1966 said:

well, that hardly looks indoors to me...I blame RV!

 

THANKS FOR PICTURES---KEEP THEM COMING

Share this post


Link to post
Share on other sites
7 hours ago, FirefightnRick said:

It took what seemed like forever to finish my son’s high school IPF(75yd x 65yd playing surface and 52ft high) because the manufacturer wasn’t  able to keep up with demand, and kept delivering it in separate pieces.  It’s damn nice though and was worth the wait.

15822CF1-13B5-4425-9BA1-BF67E783C22C.png.3d01a913eff2088cecda23b5ac7b60b1.png

Has four Big Ass Fans.

8F755917-91C4-42E0-829F-28091F42CC19.png.8fc2f5d33edbb23d5be48a00e299439c.png

Has four 75 foot long batting cages suspended from the ceiling.

46ED445F-B4AC-47CD-8D4D-ABC4BD8A4891.png.5f1587cfb76a0afec835480bf20fe5ab.png

396BFEFA-AE0C-436D-B389-9F68CBBEB1D1.png.977b61e20ba5053decdeda5419771540.png

So as nice and as large as the Mean Green IPF is going to be I’ll be surprised if it’s completed by the end of August.

 

Rick

It probably won’t be ready for August, but it will be done by December when we need a warm place to practice for our College Footballs Playoff semifinal. 

  • Upvote 1
  • Skeptical Eagle 1

Share this post


Link to post
Share on other sites

Would have been cool if they set up a web cam.  I think they did this with Apogee construction, and were given the option to download a time lapse video.

  • Upvote 4

Share this post


Link to post
Share on other sites
2 minutes ago, greenminer said:

Would have been cool if they set up a web cam.  I think they did this with Apogee construction, and were given the option to download a time lapse video.

Great idea... contact AD!

  • Upvote 1

Share this post


Link to post
Share on other sites

I keep waiting on someone to post a picture of a small replica of the practice facility 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now